№ 05 Method 7 min read

Drawing first, building second — our process on a 36 m² stand

From the first scribble to the last screw. We walk through six weeks of work on a recent corporate stand, with every studio handover.

From the first scribble to the last screw. We walk through six weeks of work on a recent corporate stand, with every studio handover.

The full piece is being prepared by the workshop. In the meantime, file a brief and we will answer the question directly for your project.