Exhibition stand builder in Lagos, Nigeria

The largest market in the network: Adeola Bankole's seven-strong Lagos bench builds for Landmark Centre, Eko Convention Centre and Nigeria's trade-fair calendar.

The bench in Lagos.

Lagos rewards preparation more than any city we work in: venue schedules are tight, and gate logistics eat unplanned hours. The bench plans deliveries in off-peak windows and keeps a supplier list on Victoria Island and the mainland both. The suspended-ring watchmaker pavilion in our portfolio was engineered for a Lagos hall's rigging rules — and raised on schedule.

Like every market we serve, Nigeria works on the split model: design and engineering stay in the Abidjan studio, fabrication and raise-day happen here, by a crew that lives here. What crosses the border is a drawing pack — never a truck. The finish standard is enforced with the shared sample board and a 22-photo raise-day audit reviewed against the drawings before your walk-through.

Pricing follows the network's flat logic: the 600 € incl. tax / m² baseline with a 1.07 country factor — from 642 € incl. tax per m² (NGN invoicing at the day rate available). The factor covers exactly one thing: material logistics into the local market, and it appears as its own labelled line in the quote. The rate includes design, fabrication, raise and strike; venue services (power, rigging) and screen hardware (re-invoiced at cost +10%) are itemised separately — no hidden costs. Run your configuration in the 10-second estimate, or file a brief for a firm quote within 48 hours.

Where we raise in Lagos.

Landmark Centre, Victoria Islandtrade shows, expos and brand activations
Eko Convention Centre, Eko Hotelscongresses, summits and large-format builds
Balmoral Convention Centre, Federal Palaceexhibitions and corporate events

Questions we hear from clients in Lagos.

How much does an exhibition stand cost in Lagos?
Nigeria carries a 1.07 country factor: from about 642 € incl. tax per m². A 12 m² custom stand starts around 7,700 € all-in. Invoicing in NGN at the day rate is available on request.
What is the lead time for a stand in Lagos?
16 days from signed brief to raise-day, built locally by the Lagos bench. Suspended or above-head elements come with a countersigned structural calc note for the venue inspector.
Can you handle Lagos venue logistics?
Yes — delivery slots, gate passes and rigging supervision are planned by the local bench as part of every Lagos project. It is the market where our documentation habit pays off most.
Contact hello@boothsmith.africa
WhatsApp · Abidjan HQ +225 07 07 92 40 78
Adeola Bankole · Lagos local team reachable via the Abidjan office — response within 4 business hours

From the workshop notes.